Skip to main content

London Exhibition Company

London · ExCeL London

Construction & Built Environment

Exhibition Stand Builders for UK Construction Week London

Turnkey custom stands for UK Construction Week London at ExCeL — design, in-house build, ExCeL rigging paperwork, install and on-stand support. Built to demo product to the whole supply chain.

UK Construction Week London exhibition stand — London Exhibition Company

From £3,950
Next edition: 11–13 May 2027 · ExCeL London
£3,950+Starting price
ExCeL LondonVenue
20,000+Visitors
600+Exhibitors
3 daysDuration
48hrQuote turnaround
£3,950+Starting price
ExCeL LondonVenue
20,000+Visitors
600+Exhibitors
3 daysDuration
48hrQuote turnaround
★ Recent Builds ★

Our Stands on the UK Construction Week London Show Floor

Real stands we have designed and built for brands at major UK shows. Every stand is pre-built and inspected in-house before it is delivered to the venue.

★ Transparent Pricing ★

UK Construction Week London Stand Pricing — All-Inclusive

One invoice covers design, build, graphics, delivery, install, dismantle and show paperwork — no material-handling surprises, no electrical add-ons after the show. Every quote includes a free 3D concept before you commit.

Essential

£3,950
A clean, professional shell-scheme upgrade or compact custom build that holds its own next to larger stands. Right for first-time exhibitors or shows where the conversation matters more than the spectacle.
Best for: first-time exhibitors and focused, conversation-led stands
  • Backlit fabric back wall (full width)
  • Branded counter(s)
  • Standard LED lighting
  • High-resolution graphics design
  • Delivery, install and dismantle
  • Show paperwork handled

Premium

£34,000
Flagship and double-decker stands — layered structures, hospitality areas, bespoke joinery and integrated tech.
Best for: flagship presence — double-deck, island and high-impact builds
  • Everything in Standard
  • Wood & brushed-metal finishes
  • Double-deck or raised structure
  • Integrated touchscreen / kiosk
  • Branded furniture & hospitality area
  • Priority in-house build slot

Not included: venue space rental (paid to the show organiser), AV beyond the items listed, and bespoke add-ons — quoted line by line, so the number you sign is the number you pay.

★ Watch the Build ★

From Concept to Show Floor in 4 Weeks

Watch how a UK Construction Week London stand goes from a 3D rendering to a finished install at ExCeL London.

At a glance
Next edition 11–13 May 2027 · ExCeL London
Starting price £3,950+
Venue ExCeL London
Visitors 20,000+
Exhibitors 600+
Duration 3 days
Quote turnaround 48hr

UK Construction Week London Stand Builders: ExCeL Logistics, the Whole Supply Chain, and What Wins Specifiers

UK Construction Week London is the UK's largest built-environment trade show, held each May at ExCeL. For 2027 it forms part of a combined Built Environment Super Event, co-locating with Futurebuild and The Stone & Surfaces Show, and draws upwards of 20,000 professionals — architects, contractors, developers, engineers, specifiers, government and suppliers — across the whole construction supply chain.

That breadth shapes the brief: you are talking to specifiers, buyers and trades at once, so the stand has to show product credibly — ideally working or sampled — say clearly what it does and who specifies it, and give you space for the technical conversation that leads to a spec or an order. Construction buyers trust what they can see and touch.

For a manufacturer or supplier that means the stand has to satisfy two jobs at once: catch the eye of the trade moving fast down a huge aisle, and reward the specifier who stops with real substance. The exhibitors who win specs here design for both rather than betting on one.

Building at ExCeL London: the rules that shape your stand

ExCeL is a pillar-free hall with around 10m of clear internal height, but your stand does not get all of it. For space-only stands the working height limit at most ExCeL shows is 6m, and anything ExCeL classes as a complex structure — double-deckers, heavy suspended elements, long unsupported spans — triggers a formal sign-off you need to budget time for, not just money.

Complex designs must be submitted with engineering calculations applying a minimum factor of safety of 1.5. An independent structural engineer reviews the drawings and, if satisfied, issues a Certificate of Structural Adequacy at design stage, which releases your Certificate to Build; the same engineer inspects the stand on site during build-up before you can open. Miss a calculation or submit late and you do not build.

Overhead rigging is controlled tightly: all primary rigging to the ceiling is installed exclusively by ExCeL's own team, ordered through ExCeL's webshop and confirmed around 28 days before tenancy for the advance rate. Lightweight static items hang from drop wires up to 50kg; heavier loads are separate, costlier orders.

The smaller rules catch people out too: platforms above 170mm need ramped, accessible access; solid walls along an open gangway edge are generally not allowed; only water-based paint may be used on site; and every structure must be fully self-supporting. We design to all of this from the first sketch and submit the venue paperwork, so the build you approve is the build that opens.

What a winning construction stand needs

The stands that work here put the product in front of people, not on a banner. We build in real product, samples or a live demonstration so a specifier or contractor can assess it properly, clear signage that states the product and its application, and a meeting space for the technical and commercial conversations these sales need. Robust construction matters because the audience handles everything and is quietly judging your build quality.

We also design for the mixed audience: a quick, clear message for the trade walking past, and the depth — spec sheets, samples, a knowledgeable conversation — for the architect or specifier who stops to dig in.

Lighting and presentation matter even for industrial product: a well-lit, cleanly finished stand makes a building material or a piece of plant look like the premium option, while harsh hall light and a cluttered display make the same product look like a commodity.

Designing for demos and specifiers

Many of the strongest UKCW stands are built around a live demo — a product installed, tested or operated — because seeing it work answers more questions than any datasheet. We design the demo position and the services it needs, plus a clear path from watching to a seated technical discussion. For products that get specified rather than impulse-bought, we make sure the spec information and samples are easy to take away and easy to remember.

Where heavy or large product is on show, the structure and floor loading are designed for it from the start, so the stand safely carries what you're demonstrating.

We also make the spec and sample easy to take away and easy to remember, because a product that gets specified weeks later is won by the literature and sample that left the show in the right hands, not just by the conversation on the day.

And because the trade remembers a demo it watched far longer than a panel it read, a well-staged demonstration is often the single best investment of stand space at this show.

What a UK Construction Week stand costs

A turnkey stand typically runs roughly £3,950–£12,500 for a compact custom build, £12,500–£28,000 for a mid-size build with demo space and a meeting area, and £28,000 and up for a flagship or double-deck build. The quote is turnkey — design, build, graphics, lighting, delivery to ExCeL, install, dismantle and the rigging and electrical paperwork are all included — and the demo fit-out, structure and bespoke joinery move the number most.

The spend that pays back here is usually in a credible demo and a solid, well-finished build rather than raw size, because a professional construction audience reads build quality instantly and a flimsy stand undercuts a quality product.

Stand sizes and layouts

Stands run from compact spaces for first-time suppliers up to large islands and double-deckers for major manufacturers — ExCeL's 6m space-only height makes a raised structure viable where the budget allows. The layout balances product display and demo with meeting capacity, so we separate a busy or noisy demonstration from the space where specs and orders are discussed.

Whatever the size, we build to a finish that reads as credible to a professional construction audience, because a stand that looks poorly made undercuts a quality product in front of people who build for a living.

Where a double-deck makes sense, the upper floor buys genuinely quieter meeting and hospitality space above a busy demo floor — valuable at a 20,000-visitor show — and we prepare the structural sign-off it needs in-house.

Getting into ExCeL: build-up timing

UKCW sits in a busy May run at ExCeL, so material-handling, rigging and the electrical contractor book up early and late orders attract surcharges. We confirm your space-only window, book rigging at the advance rate (around 28 days out), coordinate power for demos with the appointed contractor, and crate to a schedule that lands the stand inside its slot — and we prepare any structural sign-off in-house where your design needs it.

Because the 2027 show co-locates several built-environment events, the floor is large and busy in build-up, so a planned, slotted delivery matters more than ever to avoid queuing and surcharges.

Reusing your stand between editions

UKCW runs every year (with an autumn Birmingham edition too), so a modular, reusable stand is sound economics. We store the core, refresh the graphics and product display for each edition, and keep your structural sign-off and contractor orders on file — so a returning stand, including a double-deck, doesn't restart the approvals process from scratch.

Next step for your UK Construction Week London stand

Send us your space size, hall position and goals for UK Construction Week London. You'll get a custom 3D concept and a fixed, all-inclusive quote within 48 hours — designed to ExCeL's rules, with structural sign-off built into the timeline if your design needs it. We build in-house and install at ExCeL London, so the stand you approve in the rendering is the stand that opens.

We also design and build exhibition stands for other major UK shows — see the full show calendar for construction & built environment and beyond, all with the same in-house team, fixed all-in pricing and full venue paperwork.

★ Field Notes ★

Build notes for ExCeL London

Field notes from Daniel Hughes, Senior Project Manager at London Exhibition Company — the detail that isn’t in the exhibitor manual.

DH

Daniel HughesSenior Project Manager, London Exhibition Company · 14 years building stands at ExCeL, Olympia, the NEC, the BDC and the SEC
01

Rigging is ordered through ExCeL — and the clock starts early

Anything suspended over your stand goes through ExCeL's official rigging webshop, and orders are due roughly 28 days before build-up; drop wires are capped at 50kg each. Leave it late and you either lose the hang or pay rush rates. On any design with a hanging element we file the rigging order the day it's signed off.

02

Space-only height runs to 6 metres

Space-only stands at ExCeL can build to 6m, which is what makes double-deck and tall feature towers possible here. Anything structurally complex needs structural calculations plus a Certificate of Structural Adequacy and a Certificate to Build submitted ahead of the show. We prepare these in-house.

03

Platforms over 170mm need an edge ramp

Any raised floor above 170mm has to be ramped for accessibility. It's a small rule that changes your footprint, so we design the ramp in from the start rather than losing usable stand space.

04

Finish off-site — only water-based paint on the floor

ExCeL permits only water-based paint for touch-ups in the hall, so finishes are completed and inspected at our workshop and the on-site crew assembles rather than fabricates.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line value proposition a passer-by actually reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the side panel is your aisle-facing billboard and the most wasted surface at most shows.
  3. A freestanding sign or counter at the very front that blocks the sightline into the stand and stops people stepping in.
  4. Under-staffing at peak — you need someone working the aisle separately from whoever is running meetings.
  5. A fully enclosed meeting room on a small stand: it eats a quarter of the floor and leaves the rest cramped. Under ~30 sqm a semi-open nook usually works better.
  6. Leaving rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
★ More Stand Designs ★

Browse UK Construction Week London Stand Designs

Ready-to-customise designs from our portfolio. Pick a base, customise the graphics — turnkey in around four weeks.

Custom Stand

Explore sizes →

Island Stand

Explore sizes →

Double-Deck Stand

Explore sizes →

Open-Plan Stand

Explore sizes →

Peninsula Stand

Explore sizes →

Feature-Lit Stand

Explore sizes →

Bespoke Stand

Explore sizes →

Corner Stand

Explore sizes →

★ FAQ ★

20 Questions Exhibitors Ask About UK Construction Week London Stands

Real answers with real numbers. Click any question to expand.

How tall can my stand be at UK Construction Week London, and do I need structural approval?

For space-only stands at ExCeL London the working height limit at most shows is 6m. Anything treated as a complex structure — double-deckers, large suspended elements — needs engineering calculations reviewed by an independent structural engineer, with a structural-adequacy certificate at design stage and an on-site inspection before you open. We handle the full submission so it doesn't put your build at risk.

Can I hang a banner or lighting rig above my UK Construction Week London stand?

Yes, but suspended rigging is installed only by ExCeL's appointed rigging team and ordered through the official webshop, confirmed around 28 days before tenancy for the advance rate. Lightweight static items hang from drop wires up to 50kg; heavier loads are separate orders. We design within standard trim heights and order it all for you.

How much does a UK Construction Week London stand cost?

Roughly £3,950–£12,500 for an enhanced shell scheme or compact custom build, £12,500–£28,000 for a mid-size custom build, and £28,000+ for flagship, double-decker or large island builds. Every quote is fixed and all-inclusive with a free 3D concept.

When is UK Construction Week London and how early should I book?

UK Construction Week London runs each May at ExCeL — the next edition is 11–13 May 2027, co-located with Futurebuild and The Stone & Surfaces Show. Because the best stand positions and production slots go early, we recommend booking 8–14 weeks ahead, earlier for a large or complex-structure build.

What's included in a turnkey UK Construction Week London stand?

Custom 3D design, in-house build, full graphics, delivery to ExCeL London, certified install and dismantle, all space-only and rigging paperwork, electrical coordination with the appointed contractor, structural sign-off where required, and a dedicated project manager from kickoff to breakdown — on one invoice.

What's included in the price?

Every quote is turnkey: a custom 3D concept, in-house build and pre-build inspection, full graphics production, delivery to ExCeL London, certified install and dismantle, all health-and-safety and contractor paperwork, and a dedicated project manager — on one invoice.

Can I customise a design from your gallery?

Yes. Pick any base design and change graphics, colours, finishes, monitor placement, counter styles, accessories and meeting-room layout. Your final 3D rendering reflects every change before production starts.

Can I add AV, monitors and tech to the stand?

Yes. Monitors, touchscreen kiosks, tablet stands, charging points and audio are all standard add-ons included in your flat quote — no separate AV vendor to coordinate.

Do you provide on-site support during UK Construction Week London?

Yes. Our team is on call during UK Construction Week London show hours for anything from graphic touch-ups to electrical issues, and larger stands include a dedicated on-site project lead.

What happens to the stand after the show?

Our crew dismantles and removes the stand, and we can store reusable elements for your next edition and refresh the graphics — so you are not paying to rebuild from scratch each time.

What is your in-house pre-build guarantee?

Every stand is fully assembled and inspected at our facility before delivery to ExCeL London. We send preview photos for approval, then it ships — so the on-site install is the replication of an approved build, not first-time assembly on show day.

Do you build double-decker stands?

Yes. Where the floor plan and budget allow, a double-decker doubles your footprint and adds a first-floor area. At ExCeL London a two-storey stand needs engineering sign-off, which we manage end to end.

Do you work with international exhibitors at UK Construction Week London?

Yes. As part of a group operating across the USA, UAE and Europe, we support international brands exhibiting at UK Construction Week London with one point of contact, a consistent design language and full UK venue and logistics handling.

How do I get started?

Send your UK Construction Week London stand space, dates and any design preferences. You'll receive a custom 3D rendering and a fixed, all-inclusive quote within 48 hours — no obligation.

Do you handle electrics, lighting and power?

Yes. We design the lighting scheme and order power, rigging and connections from ExCeL's appointed contractor, included in your flat quote — you don't manage a separate electrical supplier.

Do you offer rental or shell-scheme upgrade stands for UK Construction Week London?

Yes. Alongside full custom builds we offer fixed-price rental and shell-scheme upgrades — fast, cost-effective, and dressed to look bespoke. Ideal for first-time or budget-conscious exhibitors.

Can you build a sustainable, reusable stand?

Yes. We build reusable modular systems and use recycled and low-waste materials, then store and refresh the stand between editions — better for budget and for your sustainability reporting.

Can you build a private meeting room into the stand?

Yes. A semi-enclosed meeting or consultation space is one of the most useful features at UK Construction Week London; we design it into the layout with the right acoustics, seating and storage.

What size stand do I need?

It depends on your goals at UK Construction Week London — a 9–18m² stand suits a focused presence, 18–50m² gives room for demos and meetings, and 50m²+ supports a flagship or double-decker build. Tell us your objectives and we'll recommend a size and layout.

Can you build live product demonstrations for construction products?

Yes. Construction buyers trust what they can see and touch, so we build in real product, samples or a working demo with the services and floor loading it needs, plus a meeting space for the technical and spec conversations that follow — and we prepare any structural sign-off in-house.

Get Your UK Construction Week London Stand Quote in 48 Hours

Custom 3D rendering. All-inclusive pricing from £3,950. No post-show billing. Trusted by exhibitors at major UK trade shows.


£3,950+Starting price
ExCeL LondonVenue
20,000+Visitors
600+Exhibitors
3 daysDuration
48hrQuote turnaround