Skip to main content

London Exhibition Company

Birmingham · NEC Birmingham

Manufacturing & Engineering

Exhibition Stand Builders for Subcon

Turnkey custom stands for Subcon at the NEC — design, in-house build, venue paperwork, install and on-stand support. Built to show your capability and win manufacturing buyers.

Subcon exhibition stand — London Exhibition Company

From £3,950
Next edition: Jun 2026 · NEC Birmingham
£3,950+Starting price
NEC BirminghamVenue
Jun 2027Next edition
6,000+Visitors
200+Exhibitors
48hrQuote turnaround
£3,950+Starting price
NEC BirminghamVenue
Jun 2027Next edition
6,000+Visitors
200+Exhibitors
48hrQuote turnaround
★ Recent Builds ★

Our Stands on the Subcon Show Floor

Real stands we have designed and built for brands at major UK shows. Every stand is pre-built and inspected in-house before it is delivered to the venue.

★ Transparent Pricing ★

Subcon Stand Pricing — All-Inclusive

One invoice covers design, build, graphics, delivery, install, dismantle and show paperwork — no material-handling surprises, no electrical add-ons after the show. Every quote includes a free 3D concept before you commit.

Essential

£3,950
A clean, professional shell-scheme upgrade or compact custom build that holds its own next to larger stands. Right for first-time exhibitors or shows where the conversation matters more than the spectacle.
Best for: first-time exhibitors and focused, conversation-led stands
  • Backlit fabric back wall (full width)
  • Branded counter(s)
  • Standard LED lighting
  • High-resolution graphics design
  • Delivery, install and dismantle
  • Show paperwork handled

Premium

£34,000
Flagship and double-decker stands — layered structures, hospitality areas, bespoke joinery and integrated tech.
Best for: flagship presence — double-deck, island and high-impact builds
  • Everything in Standard
  • Wood & brushed-metal finishes
  • Double-deck or raised structure
  • Integrated touchscreen / kiosk
  • Branded furniture & hospitality area
  • Priority in-house build slot

Not included: venue space rental (paid to the show organiser), AV beyond the items listed, and bespoke add-ons — quoted line by line, so the number you sign is the number you pay.

★ Watch the Build ★

From Concept to Show Floor in 4 Weeks

Watch how a Subcon stand goes from a 3D rendering to a finished install at NEC Birmingham.

At a glance
Next edition Jun 2026 · NEC Birmingham
Starting price £3,950+
Venue NEC Birmingham
Next edition Jun 2027
Visitors 6,000+
Exhibitors 200+
Quote turnaround 48hr

Subcon Stand Builders: NEC Logistics, the Procurement Buyer, and What Wins Contracts

Subcon is the UK's largest subcontract manufacturing supply-chain show, held each June at the NEC Birmingham and co-located with Manufacturing & Engineering Week. For nearly fifty years it has brought procurement teams, OEMs, engineers and design buyers together with the specialist suppliers who machine, fabricate, finish and assemble the parts behind finished products — across CNC machining, fabrication, electronics, components and more.

This is a sourcing and benchmarking show: buyers arrive with drawings, live projects and supplier gaps, looking for capability they can trust. So the brief is prove plus discuss: show your capability credibly — sample parts, finishes, tolerances, accreditations — and give your engineers room for the technical conversation that wins a contract. A stand of marketing claims loses to one that shows the work.

It's a technical, no-nonsense audience, so real parts and demonstrable capability do the persuading, not slogans.

For a subcontract manufacturer that means a stand that proves what you make: real parts, clear capability, and engineers ready to talk a live job. The suppliers who win enquiries at Subcon design the proof and the conversation together, not a wall of claims.

Building at NEC Birmingham: the rules that shape your stand

The NEC is the UK's largest exhibition venue — big, flat, pillar-free halls with generous height — which is what makes it suited to large stands and double-deckers. Space-only stands typically build to 6m, and anything the NEC classes as a complex structure (double-deck, raised platforms over a certain height, heavy suspended elements) needs structural drawings and calculations approved ahead of the show.

The NEC publishes a detailed technical e-Guide and operates appointed contractors for rigging and electrics: rigging is ordered through the venue's official rigging supplier by the published deadline, and power is ordered from the appointed electrical contractor. Order late and you pay on-site surcharges during the busiest build days. We file these the day a design is signed off.

Accessibility and fire rules apply as everywhere: raised floors need ramped edges, materials must be fire-retardant to the venue standard, and finishes are completed off-site because in-hall fabrication is limited. The NEC's scale also makes logistics the variable that decides your build week — marshalling-yard timing and hall access windows are tight in peak season, so we crate and schedule to land your stand inside its slot.

What a winning manufacturing stand needs

The stands that win enquiries show the work. We design clean, well-lit display for sample parts, components and finishes — the physical proof of what you can make — with clear signage on your capabilities, sectors and accreditations, and a spot where an engineer or buyer can sit with a drawing and talk specifics. Where you run a machine, cell or process demo, we design that in safely with the power and space it needs.

Capability has to be legible: a buyer should grasp what you machine, fabricate or finish and to what tolerance before they reach you, so we give the proof and the credentials room rather than crowding the stand with generic copy.

Heavier or larger sample parts need planning into the design: we account for their weight, mounting and the floor loading the NEC requires, so an impressive component is shown safely and securely rather than awkwardly propped.

Designing for a procurement and engineering audience

Buyers walk Subcon with real sourcing needs and limited time, so the stand has to qualify them fast: a clear statement of your processes, materials, sectors and certifications so the right procurement teams and engineers stop. We design a path from the parts on display to a seated, technical conversation where your engineers can talk capacity, lead times and quality — because that conversation is where a contract starts.

Trust cues matter to this audience — accreditations, recognisable sectors served, sample parts they can pick up — so we design space for demonstrable proof, because a procurement buyer is assessing whether you can deliver, not how clever your messaging is.

We also keep the message specific, because a buyer with a drawing in hand is looking for the supplier who clearly does their process and tolerance — a precise capability statement is found far faster than a general one.

What a Subcon stand costs

A turnkey stand typically runs roughly £3,950–£12,500 for a compact custom build with a parts display, £12,500–£28,000 for a mid-size build with capability display, a demo and a meeting area, and £28,000 and up for a flagship build. The quote is turnkey — design, build, graphics, lighting, delivery to the NEC, install, dismantle and the venue paperwork are all included — and any machine or process demo, heavy-part display and finish usually move the number.

Because the value is in the enquiries and contracts that follow, the spend that pays back is in credible capability display and the engineers to talk it through — not in spectacle, which a technical audience tends to discount.

What you don't pay extra for is in the turnkey figure — flooring, material handling and electrical — so the number you sign covers the things a parts-and-machinery stand can otherwise get caught out by.

Stand sizes and layouts

Stands run from compact spaces for specialist subcontractors up to large builds for full-service manufacturers and groups. The layout balances parts and capability display with technical-conversation space, so we put the sample parts and any demo where the aisle sees them and keep a calm seated area for the sourcing discussion. Open and corner positions help on a busy two-day floor.

Whatever the size, we present even small machined parts well, because a precision component under good light on a clean stand signals exactly the quality and care a procurement buyer is trying to assess.

Open and corner positions help a manufacturer be seen and approached across a focused, two-day sourcing floor where buyers are actively comparing suppliers.

Getting into the NEC: build-up timing

The NEC runs to a tight marshalling-yard and hall-access schedule, and services book up early. We confirm your build-up slot, plan access and floor loading for any heavy machinery or parts, order power and connections through the NEC's appointed contractors before the deadlines (late orders attract surcharges), and crate to a schedule that lands the stand inside its access window — finished and ready for the first buyer.

We brief you early on access and loading for any machinery, so a heavy demo piece is planned in rather than turning into a problem in the marshalling yard on build day.

Reusing your stand between editions

Manufacturers exhibit at Subcon and other engineering shows year after year, so a modular, reusable stand is excellent value. We store the core, refresh the graphics and capability display for each edition, and keep your demo, services and contractor orders on file — so you arrive with a current, credible stand rather than a rebuild, and can adapt the parts and message as your capability grows.

We also keep your sample parts and capability boards current between editions, because the work you want to win this year isn't always what you showed last year, and the display should reflect your latest capacity.

Next step for your Subcon stand

Send us your space size, hall position and goals for Subcon. You'll get a custom 3D concept and a fixed, all-inclusive quote within 48 hours — designed to the NEC's rules, with structural sign-off built into the timeline if your design needs it. We build in-house and install at NEC Birmingham, so the stand you approve in the rendering is the stand that opens.

We also design and build exhibition stands for other major UK shows — see the full show calendar for manufacturing & engineering and beyond, all with the same in-house team, fixed all-in pricing and full venue paperwork.

★ Field Notes ★

Build notes for NEC Birmingham

Field notes from Daniel Hughes, Senior Project Manager at London Exhibition Company — the detail that isn’t in the exhibitor manual.

DH

Daniel HughesSenior Project Manager, London Exhibition Company · 14 years building stands at ExCeL, Olympia, the NEC, the BDC and the SEC
01

Rigging and power go through the NEC's appointed contractors

At the NEC, overhead rigging is ordered through the venue's official rigging supplier and electrics through the appointed electrical contractor, both against published deadlines. Order late and you pay on-site surcharges during the busiest build days. We file these the day a design is signed off.

02

Space-only height runs to 6 metres

Space-only stands at the NEC build to 6m, which is what makes double-deck and tall features possible. Anything the NEC classes as a complex structure — double-deck, raised platforms, heavy suspended elements — needs structural drawings and calculations approved ahead of the show. We prepare these in-house.

03

Logistics run on the marshalling yard

The NEC is the UK's largest venue and access runs to a tight marshalling-yard and hall-access schedule, especially in peak season. We crate and time deliveries to your access window so the stand lands on schedule instead of queuing in the yard.

04

Finish off-site to the NEC fire standard

Materials must meet the venue's fire-retardant standard and in-hall fabrication is limited, so finishes are completed and inspected at our workshop and the on-site crew assembles clean.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line value proposition a passer-by actually reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the side panel is your aisle-facing billboard and the most wasted surface at most shows.
  3. A freestanding sign or counter at the very front that blocks the sightline into the stand and stops people stepping in.
  4. Under-staffing at peak — you need someone working the aisle separately from whoever is running meetings.
  5. A fully enclosed meeting room on a small stand: it eats a quarter of the floor and leaves the rest cramped. Under ~30 sqm a semi-open nook usually works better.
  6. Leaving rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
★ More Stand Designs ★

Browse Subcon Stand Designs

Ready-to-customise designs from our portfolio. Pick a base, customise the graphics — turnkey in around four weeks.

Custom Stand

Explore sizes →

Island Stand

Explore sizes →

Double-Deck Stand

Explore sizes →

Open-Plan Stand

Explore sizes →

Peninsula Stand

Explore sizes →

Feature-Lit Stand

Explore sizes →

Bespoke Stand

Explore sizes →

Corner Stand

Explore sizes →

★ FAQ ★

20 Questions Exhibitors Ask About Subcon Stands

Real answers with real numbers. Click any question to expand.

How tall can my stand be at Subcon, and do I need structural approval?

For space-only stands at NEC Birmingham the working height limit at most shows is 6m. Anything treated as a complex structure — double-deckers, large suspended elements — needs engineering calculations reviewed by an independent structural engineer, with a structural-adequacy certificate at design stage and an on-site inspection before you open. We handle the full submission so it doesn't put your build at risk.

Can I hang a banner or lighting rig above my Subcon stand?

Yes, but suspended rigging is installed only by the NEC's appointed rigging team and ordered through the official webshop, confirmed around 28 days before tenancy for the advance rate. Lightweight static items hang from drop wires up to 50kg; heavier loads are separate orders. We design within standard trim heights and order it all for you.

How much does a Subcon stand cost?

Roughly £3,950–£12,500 for an enhanced shell scheme or compact custom build, £12,500–£28,000 for a mid-size custom build, and £28,000+ for flagship, double-decker or large island builds. Every quote is fixed and all-inclusive with a free 3D concept.

When is Subcon and how early should I book?

Subcon runs each June at the NEC Birmingham as the UK's largest subcontract manufacturing supply-chain show — the next edition is June 2027 (exact dates to be confirmed). Because the best stand positions and production slots go early, we recommend booking 8–14 weeks ahead, earlier for a large or complex-structure build.

What's included in a turnkey Subcon stand?

Custom 3D design, in-house build, full graphics, delivery to NEC Birmingham, certified install and dismantle, all space-only and rigging paperwork, electrical coordination with the appointed contractor, structural sign-off where required, and a dedicated project manager from kickoff to breakdown — on one invoice.

What's included in the price?

Every quote is turnkey: a custom 3D concept, in-house build and pre-build inspection, full graphics production, delivery to NEC Birmingham, certified install and dismantle, all health-and-safety and contractor paperwork, and a dedicated project manager — on one invoice.

Can I customise a design from your gallery?

Yes. Pick any base design and change graphics, colours, finishes, monitor placement, counter styles, accessories and meeting-room layout. Your final 3D rendering reflects every change before production starts.

Can I add AV, monitors and tech to the stand?

Yes. Monitors, touchscreen kiosks, tablet stands, charging points and audio are all standard add-ons included in your flat quote — no separate AV vendor to coordinate.

Do you provide on-site support during Subcon?

Yes. Our team is on call during Subcon show hours for anything from graphic touch-ups to electrical issues, and larger stands include a dedicated on-site project lead.

What happens to the stand after the show?

Our crew dismantles and removes the stand, and we can store reusable elements for your next edition and refresh the graphics — so you are not paying to rebuild from scratch each time.

What is your in-house pre-build guarantee?

Every stand is fully assembled and inspected at our facility before delivery to NEC Birmingham. We send preview photos for approval, then it ships — so the on-site install is the replication of an approved build, not first-time assembly on show day.

Do you build double-decker stands?

Yes. Where the floor plan and budget allow, a double-decker doubles your footprint and adds a first-floor area. At NEC Birmingham a two-storey stand needs engineering sign-off, which we manage end to end.

Do you work with international exhibitors at Subcon?

Yes. As part of a group operating across the USA, UAE and Europe, we support international brands exhibiting at Subcon with one point of contact, a consistent design language and full UK venue and logistics handling.

How do I get started?

Send your Subcon stand space, dates and any design preferences. You'll receive a custom 3D rendering and a fixed, all-inclusive quote within 48 hours — no obligation.

Do you handle electrics, lighting and power?

Yes. We design the lighting scheme and order power, rigging and connections from the NEC's appointed contractor, included in your flat quote — you don't manage a separate electrical supplier.

Do you offer rental or shell-scheme upgrade stands for Subcon?

Yes. Alongside full custom builds we offer fixed-price rental and shell-scheme upgrades — fast, cost-effective, and dressed to look bespoke. Ideal for first-time or budget-conscious exhibitors.

Can you build a sustainable, reusable stand?

Yes. We build reusable modular systems and use recycled and low-waste materials, then store and refresh the stand between editions — better for budget and for your sustainability reporting.

Can you build a private meeting room into the stand?

Yes. A semi-enclosed meeting or consultation space is one of the most useful features at Subcon; we design it into the layout with the right acoustics, seating and storage.

What size stand do I need?

It depends on your goals at Subcon — a 9–18m² stand suits a focused presence, 18–50m² gives room for demos and meetings, and 50m²+ supports a flagship or double-decker build. Tell us your objectives and we'll recommend a size and layout.

Can you build a stand to display sample parts and a machine demo?

Yes. Subcon buyers assess capability, so we design clean, well-lit display for sample parts, components and finishes, clear capability and accreditation signage, and a seated area for the technical sourcing conversation — and where you run a machine or process demo we design it in safely with the power, access and floor loading it needs.

Get Your Subcon Stand Quote in 48 Hours

Custom 3D rendering. All-inclusive pricing from £3,950. No post-show billing. Trusted by exhibitors at major UK trade shows.


£3,950+Starting price
NEC BirminghamVenue
Jun 2027Next edition
6,000+Visitors
200+Exhibitors
48hrQuote turnaround