| ExCeL London | Royal Docks · large pillar-free halls, the city's biggest shows |
|---|---|
| Olympia London | Kensington · historic Grand and National halls |
| Business Design Centre | Islington · smaller, design-led shows |
| Our office | 128 City Road, London EC1V 2NX |
ExCeL or Olympia: the venue changes the stand
London's two big venues ask for different stands. ExCeL has large, pillar-free halls with high ceilings, so space-only stands can usually build up to 6 m, and double-deckers are common at the biggest shows — subject to structural calculations and sign-off. Rigging for hanging banners is ordered through ExCeL's own service, typically around four weeks before build-up.
Olympia is a historic building in Kensington. Access, build-up windows and height limits are generally tighter than at ExCeL, and they vary between halls and shows, so the exhibitor manual matters more than usual. Stands here tend to be designed to go up quickly and look finished from every side.
The Business Design Centre in Islington hosts smaller, design-led shows such as London Art Fair, where finish and lighting carry more weight than size.
What we handle for London shows
- Stand design, 3D concepts and graphics
- In-house build, pre-build and delivery into the venue
- Stand plans, risk assessments and method statements
- Electrics and rigging orders through the venue's contractors
- Structural sign-off for double-deckers and complex stands
- Install, on-site support, dismantle and storage
Booking ahead
London's busiest weeks — early November at ExCeL is the clearest example — fill venue contractors, rigging slots and transport early. Allow 8–14 weeks for most stands, and more for double-deckers.